New designs to modernise Road Town sidewalks

Road Town sidewalks are set for upgrades after a January 7, 2026 site visit by the Road Town Partnership Board and public-sector stakeholders. The proposed designs, developed by the Public Works Department and reviewed by the RDA, aim to improve pedestrian safety, accessibility and drainage to meet international and ADA standards.

· Updated

Road Town’s sidewalks are poised for a significant upgrade after members of the Road Town Partnership Board and key public-sector stakeholders conducted a walk-through and site visit on January 7, 2026 to review proposed designs. The inspection formed part of the Road Town Development Project led by the Reconstruction and Development Agency (RDA).

According to the RDA, the new designs—prepared by the Public Works Department—seek to bring sidewalks in line with international standards, including repairs to pavements to meet Americans with Disabilities Act (ADA) guidelines, the installation of drain grates to improve road drainage, and the widening of parking-lot entrances where necessary to ease traffic flow onto main roads. "We ensure shared alignment on the design requirements and expectations that will shape implementation priorities," the RDA said, describing the on-site review as a way to coordinate technical and operational needs across departments.

The delegation included Committee Chair Honourable Luce D. Hodge-Smith (R4) and Co-Chair Ms Lorna Christopher, alongside representatives from the Ministry of Tourism, Culture and Sustainable Development; the Ministry of Communications and Works; the Office of the City Manager; the Public Works Department; the Water and Sewerage Department; and the RDA Project Team.

A follow-up meeting with representatives from the business community is planned to gather private-sector input and discuss how works will affect commerce and pedestrian access during construction. For residents, the changes aim to deliver more accessible walkways for people with mobility challenges, safer pedestrian routes for families and seniors, and infrastructure that better manages stormwater runoff—a frequent concern during heavy rains and storms.

Widened entrances and improved drainage should also help reduce congestion and damage to adjoining road surfaces, which can reduce maintenance costs over time. RDA and partner agencies have not yet released a detailed implementation timeline or cost estimate, saying that alignment with stakeholders is the immediate priority.

Residents and business owners can expect further announcements after the scheduled consultations with the private sector, which will outline phases, expected disruptions and opportunities for community input. The Road Town Development Project represents a coordinated push by local authorities to modernise public spaces and improve everyday safety and mobility within the capital, with an emphasis on accessibility and resilient infrastructure.

Primary source: VINO

Open this story on BVI Live